Site Location: Bristol Stadium
Length of Hire: 2 Weeks
Contract Value: £3.4k
Our Client required a double-sided formwork system capable of forming the structure of both a new Retaining Wall and a Hydrotherapy Pool with some complex geometry. Our Design Team produced bespoke designs for each pour element using our new Frami Formwork System.
We utilised many of the same panels on each pour which reduced the overall amount of equipment required. The Contractor was able to erect all the required formwork with a safe access system significantly faster than traditional timber methods.