Retaining Wall & Hydrotherapy Pool – Frami Formwork, Bristol Stadium


A contractor delivering a reinforced concrete retaining wall and hydrotherapy pool required a versatile formwork solution capable of accommodating complex geometry and varying pour elements. SEL provided a double-sided formwork system, enabling the accurate formation of both structures while maintaining efficiency across multiple pours.
Using our Frami formwork system, the contractor was able to:
- Form retaining walls and hydrotherapy pool structures with complex geometry
- Utilise a modular panel arrangement across multiple pour elements, reducing overall equipment requirements
- Achieve consistent concrete finishes and dimensional accuracy
- Erect and strike formwork efficiently using an integrated safe access system
- Significantly reduce installation time compared to traditional timber formwork methods
Our in-house design team developed bespoke temporary works designs for each pour sequence, ensuring the system was optimised for both structural requirements and site practicality. This approach provided a flexible, cost-effective and programme-efficient formwork solution, supporting safe installation while minimising labour and material waste.
If you'd like advice on Frami, formwork or temporary works in general, contact your nearest SEL depot and we'll be happy to help.

We can help with your next project.
Our team is friendly, knowledgeable and ready to consult. We offer complimentary site visits, fast delivery and competitive rates. Simply fill in the form and we'll be in touch.
You can also give us a call at any time.
