Falsework & Formwork

SEL hires and sells formwork, shuttering and falsework systems for reinforced-concrete walls, columns, slabs, soffits, foundations, tanks, retaining walls and other in-situ concrete structures. Our range includes Doka Frami wall formwork, Dokaflex soffit formwork, Titan aluminium falsework, Slimshore soldiers, column clamps, manhole shutters and associated accessories. Temporary Works Design is available for project-specific requirements.

Use cases

  • Basements, foundations, pile caps and retaining walls
  • Bridges, abutments, culverts and headwalls
  • Floor slabs, soffits, podiums and suspended decks
  • Concrete walls, columns, cores and transfer structures
  • Underpinning and structural alterations
  • Treatment tanks, reservoirs, pools and water-retaining structures
  • Tunnels, shafts, lift pits and box structures
  • Staircases, ramps and complex concrete geometries
  • Flood defences, marine and civil-engineering structures
  • Hydrotherapy pools, swimming pools and specialist tanks
  • Architectural concrete and bespoke shaped pours

Our Solutions

Unsure which formwork system you need? Speak to an SEL expert today and we'll give you a free consultation.

Case studies

Our Expertise

Our engineers can take the headache out of formwork planning with bespoke Temporary Works Designs. Here are some recent examples. Whether facing awkward geometry, large pours or unique ground conditions, our engineers were able to deliver a safe, reliable solution.

Planning a concrete pour? Our engineers can provide Temporary Works Design no matter how difficult the job. Get in touch today.

Which Formwork or Falsework System Do I Need?

The right system depends on the structural element, lateral concrete pressures, slab thickness and propping height.

Structure / Pour TypeStructural RequirementsRecommended Solution
Reinforced-concrete wallsStraight wall faces and standard modular heightsDoka Frami Panel Formwork System
Bespoke or curved wallsCurved radii, non-standard geometry, or single-sided poursTraditional formwork propped by Slimshore Soldiers
Floor slabs and soffitsTypical slab depths (up to ~300mm) at standard storey heightsDokaflex 1-2-4 Soffit Support System
Heavy slabs, decks or high proppingHigh load capacities, thick transfer slabs, or high-propped heightsTitan Aluminium Falsework System
Concrete columnsSquare or rectangular sections formed in timber or modular panelsColumn Clamps or Frami Panels
Manholes and circular chambersCircular in-situ pours, rings, and surroundsManhole Shutters

These are typical applications. Contact us for a free consultation on which formwork or falsework arrangement best suits your project.

Common questions

What is the difference between formwork and falsework?
Formwork is the mould: the shutters the wet concrete is poured against. The concrete takes the shape of the formwork mould, so it is crucial you use a clean and well-supported system that won't budge during curing. Falsework therefore is everything that holds that mould up – the props, beams and frames carrying the weight until the concrete cures and can hold its own. For a wall pour you can sometimes get away with just formwork, but for heavier pours or suspended slabs or soffits you'll need falsework too.
Is shuttering and formwork the same thing?
Yes. Shuttering is the older site name; formwork is what engineers and the codes tend to call it. You'll still hear shuttering used for traditional timber methods, like shuttering a column with ply and clamps. We can provide both, along with the ties, clamps and accessories to go with them.
What formwork do I need for walls, columns and slab edges?
Our Frami system handles walls up to about 3m high, plus columns, foundations and slab edges – with no crane needed. Square columns shuttered in timber are usually more cheaply done with column clamps. If you'd like more help choosing the right solution, please get in touch for a chat.
Should Doka Frami or traditional timber formwork be used for a concrete wall?
Doka Frami panel formwork is the primary choice for most concrete walls because its modular steel-framed panels clamp together quickly by hand, saving labor and eliminating timber waste on everything from foundations and retaining walls to lift shafts and columns. Doka Frami is also remarkably versatile: for curved or circular walls, Frami circular forming plates adapt standard panels into polygonal curves, while timber infills can be clamped directly into the Frami frame to handle custom offsets or pipe penetrations. Traditional timber shuttering is generally reserved for extremely tight, unique architectural radii where modular panels cannot fit.
Which falsework system do I need to support a slab soffit?
Give us a call, and we'd be happy to help you decide. Broadly though, Dokaflex 1-2-4 is the one for everyday slabs – anything up to about 30cm thick at normal storey heights. The markings on the beams tell you where the props go, so it's quick to put up. For thicker slabs, heavier loads or soffits too high to reach with floor props, we supply the Titan system, which can take up to 127kN on each leg.
How do wall height, pour rate and concrete pressure affect formwork design?
Wall height, pour rate, and concrete temperature determine the lateral hydrostatic pressure exerted against wall shutters during a pour. Rapid pours on tall walls generate higher concrete pressures, requiring stronger tie-rod spacing and robust panel frames. Doka Frami panels are engineered for high strength with a permissible concrete pressure of 50kN/m², allowing tall wall pours to be placed efficiently and safely. SEL's engineers verify these factors in a project-specific Temporary Works Design so your site team can pour at a safe, optimized rate.
How much does formwork cost to hire?
We offer competitive rates on all our falsework and formwork. Hire is charged per week. What you pay depends on the design, so it comes down to which systems your pour needs, how much of each, and how long they stay on site. Our engineers put together a comprehensive, itemised kit list for each project, so you can see everything that's coming before you decide. Ask us for a quote and we'll price everything up for you, often within 24 hours.
What causes formwork to fail?
Wet concrete can push on the shutters harder than people expect, and if the ties or props weren't specced for that pressure, the shutter can blow out. Pouring faster than the design allowed, striking too early and props sat on soft ground are also common issues. Here at SEL, our in-house engineers have decades of experience designing formwork and falsework solutions that factor in concrete pressure, pour rates, wind loading, ground conditions and more – so problems are found on paper, not on site. If you'd like a free consultation, simply get in touch.
How it works

Hire formwork with SEL

1

Consultation

Tell us what you're casting and how you plan to pour it, and we'll help you decide what you need.

2

Design*

We design the scheme for your pour, then issue drawings, calculations and a Temporary Works Design.

3

Delivery

We deliver to your site, inspected and ready to assemble, with test certificates where applicable.

*If you're planning to design the solution yourself, we are happy to supply kit only.

Falsework & Formwork: Common Questions

What is the difference between a push-pull prop and a standard vertical prop?
A standard vertical prop (like an Acrow) only works in compression, bearing weight directly downwards. A push-pull prop is fitted with specialized swivel ends and threaded collars that allow it to work in both compression (pushing) and tension (pulling). This dual action is necessary for fine-tuning the alignment of vertical formwork panels and bracing against wind.